China News reported on 24 November 2026, in a Yichang dispatch, that the municipal transport bureau said the Sichuan Luzhou-Yichang Zigui container dam-bypass service had formally opened. The first vessel had already left Luzhou Port and was due to arrive at Zigui's Maoping Port shortly. Chuanguan News, in a 21 November report, and Cover News, on 20 November, said the first sailing left Luzhou Port's container terminal at about 09:00 on 20 November on the vessel Minyu 2203 (民渝2203), loaded with chemicals and pulp.
According to China News, the service uses a segmented transfer: cargo moves by water from Luzhou to Maoping Port, then by highway over the Three Gorges Dam and Gezhouba, and is due at Yidu Port within 30 hours to be reloaded for Shanghai (Taicang). The bureau said that, during construction of the Three Gorges new waterway project, the Luzhou-Shanghai liner cycle can stretch from 12 days to more than 21 days, which is a concern for time-sensitive cargo such as chemicals and pulp. With the new routing, it said, end-to-end transit can be held at about 12 days and the schedule becomes more predictable. The report added that the water-highway-water move can use a point-to-point container truck toll preference published by the Hubei provincial transport department for vehicles between the Zigui Port and Yidu North toll stations. The amount of the discount was not stated.
The operating plan in the China News report is four container ships, two above the dam and two below, one sailing a week, at least 50 round trips a year, and more than 10,000 TEU of loaded boxes. Chuanguan News said Luzhou Transport and Logistics Group launched the service together with Luzhou Port and Yichang Port Group. None of the reports published freight rates, documentation cut-offs or a booking window. Shippers should confirm space, transfer timing and charges with the ports or their forwarder.