Skip to content
Seven Colorsourcing.center by Seven Color Trading Co Ltd · China

China desk · sourcing news

Brief

Sichuan Online: Chengdu's first JSQ Jetta train leaves for Almaty with 290 vehicles

Sichuan Online reported that on 19 November 2026 the first Central Asia JSQ Jetta train left Chengdu's Chengxiang yard with 290 Chengdu-built Jetta cars for Almaty, Kazakhstan, the first Chengdu dispatch of vehicles on railway JSQ auto wagons. It cited about 75% more volume and freight about 10% lower than 40-foot containers, and transit 3-5 days shorter than earlier routings via Khorgos or Urumqi. China News also reported the launch. No rates or regular timetable were published.

Sichuan Online reported that on the morning of 19 November 2026 the first Central Asia (Chengdu-Kazakhstan) JSQ Jetta train left the Chengxiang freight yard of the Chengdu Railway Logistics Center in Qingbaijiang, carrying 290 Jetta brand vehicles produced by FAW-Volkswagen's Chengdu branch to Almaty, Kazakhstan. The report said this was the first time Chengdu-made cars had been dispatched from Chengdu on railway JSQ wagons, which it described as specialized two-deck auto wagons that vehicles can drive into. China News, in a 19 November dispatch from Chengdu, and Xinhua Sichuan also reported the launch.

According to Sichuan Online, each wagon on the first train loaded 10 Jetta cars, while a standard 40-foot container usually holds only two or three vehicles of the same type. It said the JSQ wagon is about 13.8 metres longer, 0.6 metres wider and 1.2 metres taller than a 40-foot container. A FAW-Volkswagen Jetta official quoted in the report said that, compared with the previous options of a highway haul to Khorgos or a rail move to Urumqi to wait for an outbound train, the new model raises volume by about 75%, can shorten transit time by 3-5 days and lowers overall freight costs by about 10%. The Chengdu International Railway Port is about 45 kilometres from the Jetta plant, and the report said the train was given priority space.

The same report said Chengdu International Railway Port Investment and Development had signed a cooperation agreement with China Automobile Logistics Sichuan (中国汽车物流四川公司) to support complete-vehicle exports, capacity and cross-border supply-chain services, and that Chengdu aims to secure more JSQ international capacity and move toward regular, larger-scale complete-vehicle exports to Central Asia. Neither Sichuan Online nor China News published freight rates or a follow-on timetable. Exporters should confirm with the railway port or their forwarder when the next JSQ departure will accept cargo.

Source: Sichuan Online

Topics

  • chengdu
  • jsq
  • jetta
  • almaty
  • kazakhstan
  • central-asia
  • auto-export
  • rail
  • sichuan
  • chengxiang
  • china
  • sourcing

XPCC Daily: Silk Road logistics hub at Khorgos starts rail runs to Chengdu and Almaty

XPCC Daily, carried by Sina Finance on 22 November, reported that at 11:57 on 18 November 2026 a standard-gauge train left for Chengdu and a broad-gauge train left for Almaty, from a new siding at the Silk Road International Logistics Hub in the XPCC zone of Khorgos. It called this the XPCC's first hub with railway-port, customs and bonded functions. The siding is about 7.5 km, cost RMB 850 million and is designed for 2 million tonnes a year. No transit times, frequencies or rates were given.

China News: Jiangxi's first auto KD Central Asia train leaves Nanchang for Khorgos

China News reported that on 16 November 2026 Jiangxi's first auto KD Central Asia train left Nanchang International Land Port with 55 containers and 94 Jiangling (JMC) knockdown kits. Cleared by Ganjiang New Area Customs, it was due to exit via Khorgos about four days later for Central Asian countries. Cargo can now be consolidated, declared and dispatched locally. Nanchang Daily quoted COSCO Shipping Jiangxi saying transit is about 15 days and logistics cost may fall by nearly 15 percent.

Economic Daily: Khorgos highway port halves NEV export clearance with YunGang QR handoff

Economic Daily reported on 5 November 2026 that at Khorgos highway port in Xinjiang, finished-vehicle exporters now finish customs-to-exit in as little as 2 days versus about 4 days previously. Drivers use the YunGang HuoSuTong platform to pre-declare and clear at the final border-check stop with one QR code instead of carrying a stack of papers. Export workflows fell from 12 steps to 4 under customs 7x24 local direct-through. Jan-Aug inbound and outbound vehicles reached 494,000 (+23.3%), and t

Sichuan Online: Chengdu launches port-logistics-into-parks with four express services

Sichuan Online reported that on 30 October Chengdu launched port-logistics-into-parks, sending four express services (air, rail, port/customs facilitation, chain-leader logistics) into the city's 3+22+N industrial parks. An earlier rail-into-parks push since March already covers 52 parks, over 35,000 TEU and 230-plus industrial and trade firms. The upgrade targets electronics, auto, biopharma and cross-border e-commerce exporters with faster, lower-cost cross-border logistics.

Dated desk notes, not a news feed Updates.

Need the factory-floor read on a story?

The China desk can map a cited development to your SKU, QC, and lane, from Xiamen, with Dubai 3PL when the stock needs a hub.

  • D&B registered
  • Xiamen + Dubai hubs
  • Fast WhatsApp response
  • Factory network
WhatsAppSichuan Online: Chengdu's first JSQ Jetta train leaves for A